Validation of MODEMS and Integration of joint PHY/MAC WP WP6 Number D6.1 Due Month Mon, 06/30/2025 - 12:00 TIMES_Deliverable_D6.1.pdf (4.34 MB)
Development and validation of IRS-based THz links WP WP5 Number D5.4 Due Month Mon, 06/30/2025 - 12:00 TIMES_D5.4_IRS-Based-Links_VF_LIV-250714.pdf (17.12 MB)
Design, fabrication and verification of high directivity and beam steering antennas at THz frequencies. WP WP5 Number D5.3 Due Month Mon, 03/31/2025 - 12:00
Final Report on Channel Models for industrial environments at sub-THz frequencies WP WP3 Number D3.4 Due Month Mon, 06/30/2025 - 12:00 TIMES_D3.4_v1.2.pdf (13.09 MB)
Characterisation of IRS, high directivity antennas and beam steering antennas at sub-THz frequencies WP WP3 Number D3.3 Due Month Mon, 06/30/2025 - 12:00 TIMES_D3.3_RIS_v2_LIV-250628.pdf (8.21 MB)
Channel Measurements in industrial setting with IRS at sub-THz frequencies WP WP3 Number D3.2 Due Month Mon, 06/30/2025 - 12:00 TIMES_D3_2_Channel_Measurements_in_industrial_setting_with_IRS_at_sub_THz_frequencies_v1_0_3.pdf (14.09 MB)